Roof Report

Roof2

ROOF ULSTER UMC-June, 2011
Main roof of parsonage-June 3and 4, 2011-help from VIM-Volunteers in Missions-Carl Koch, chairman, and some members from Monroeton and New Albany churches.  Ulster UMW provided snacks and lunch.
Porch, back roof, garage-completed July 5, 2011-work done by Bob Lee, Linda Lee, and Jerry Rowe.

Roof1
PARSONAGE

Removed 5 layers of shingles.  Put on OSB board, 30 year (architectural grade) shingles, felt, 2 roof vents, new drip edge, flashing around chimney, ridge caps, vent cap over bathroom.

FRONT PORCH
Removed 5 layers of shingles.  Put on OSB board, felt, 30 year (architectural grade) shingles, drip edge, stepped flashing next to house.

BACK ROOF-over kitchen, half bath, and side porch
Removed and repaired rotten boards and rafters along edge.  Replaced end boards with treated lumber.  Stepped the flashing next to house.  Put on drip edge, 30 year (architectural) shingles and ridge caps. 

GARAGE
Put second layer of 30 year (architectural) shingles.

MATERIALS COST-Lowe’s-$3,310.73
Roll off box  (Northern Tier Solid Waste) $316.41-14 days.
Flashing, rough cut boards, and miscellaneous materials donated by Bob and Linda Lee.